NYC distributed edge · Powered shell colocation

NYC edge
colocation
at retrofit economics.

Powered shell capacity for established GPU operators, fitted into NYC multifamily basements. A cost basis no greenfield facility can match. Sub-5ms to Manhattan, online in months — not years.

BUILDING CROSS-SECTION CDU FIBER DHW PREHEAT apartments URBANCORE basement node 100 KW – 1 MW PER NODE · MULTI-MW PER FLEET
Latency to Manhattan venues
< 5ms
Cost basis vs greenfield
~1/10×
Per-node capacity
100 kW – 1 MW
NYC sites in pipeline
190+
For tenants

Built for GPU operators long compute, short power.

Established GPU operators and inference platforms who need NYC presence at NYC latency, with $/kW economics that don't exist anywhere else.

  • Powered shell + scheduled remote hands — you ship racks, we deliver to the CDU
  • Retrofit cost basis no greenfield NYC facility can match
  • 100 kW – 1 MW per node, multi-MW across the distributed fleet
  • Heat recovery to building DHW lowers effective $/kW vs. air-cooled
  • Sub-5ms to Manhattan; diverse fiber to 60 Hudson, 111 8th, 32 AoA
Lease capacity →
For building owners

Your basement is an asset.

Underutilized mechanical rooms across the five boroughs become recurring revenue, lower DHW costs, and credible progress against Local Law 97 — without capital outlay or tenant disruption.

  • LL97 progress — recovered heat and electrified DHW move you toward 2030 compliance
  • Recurring rental income on space that produces nothing today
  • Free heat — recovered waste heat offsets domestic hot water costs
  • Zero capital outlay — UrbanCore funds the entire fit-out
  • Mechanical room only — no roof, no core, no tenant disruption
Lease your basement →